- Vol. 36 #3, Summer 2011 – Acid Flushing of TSE Barrel Cooling Bores
 - Vol. 36 #3, Summer 2011 – General Extruder Inspection Info
 - Vol. 36 #3, Summer 2011 – Shaft Torque in HSEI TSE
 - Vol. 38 #3, Fall 2013 – Improving Thickness Uniformity with Proper System Design
 - Vol. 38 #3, Fall 2013 – Removing screw elements from shafts (and more)
 
- Vol. 35 #1, Winter 2010 – Extruder Temperature
 - Vol. 35 #1, Winter 2010 – HSEI Twin Screw Extruders
 - Vol. 35 #1, Winter 2010 – Underwater Pelletizing
 - Vol. 35 #1, Winter 2010 – Nylon Processing
 - Vol. 35 #1, Winter 2010 – Interfacial Instabilities – Gels
 - Vol. 36 #1, Spring 2011 – Going out of Specification
 - Vol. 36 #1, Spring 2011 – Material Properties and Your Material Handling System
 - Vol. 36 #1, Spring 2011 – Acquisition Rates
 
- Vol. 33 #1, Summer 2006 – Crystalline Structure
 - Vol. 33 #1, Summer 2006 – Purging Compounds
 - Vol. 33 #1, Summer 2006 – Reduce Temperature Variation
 - Vol. 33 #1, Summer 2006 – Apply Anti Seize
 - Vol. 33 #1, Summer 2006 – Designing Extrusion Lines
 - Vol. 33 #1, Summer 2006 – Pumping Instability
 - Vol. 33 #1, Summer 2006 – High Melt Temperature
 - Vol. 34 #1, Winter 2008 – Flow Disturbances
 - Vol. 34 #1, Winter 2008 – Thickness Uniformity
 - Vol. 34 #1, Winter 2008 – Rupture Discs/Relieve Valves
 - Vol. 34 #1, Winter 2008 – Troubleshooting Tip
 - Vol. 34 #1, Winter 2008 – Problem Solving
 - Vol. 34 #1, Winter 2008 – Tips for side stuffing of high levels of fillers into a twin screw extruder
 
- Vol. 31 #2, Fall 2004 – Blender Problems
 - Vol. 31 #2, Fall 2004 – Adhesion in Extrusion Coating
 - Vol. 31 #2, Fall 2004 – Adjustable Pressure Valve
 - Vol. 31 #2, Fall 2004 – Tech Tips
 - Vol. 31 #2, Fall 2004 – System Controls
 - Vol. 31 #2, Fall 2004 – Feed Backup When Working with Power
 - Vol. 31 #2, Fall 2004 – Purging
 - Vol. 31 #2, Fall 2004 – Screen Pack
 
- Vol. 27 #3, Dec. 1999 – Die pressure variation
 - Vol. 27 #3, Dec. 1999 – Vent flow 2
 - Vol. 27 #3, Dec. 1999 – Extruding amorphous materials 2
 - Vol. 27 #3, Dec. 1999 – Gas compressor
 - Vol. 27 #3, Dec. 1999 – Drive ratio
 - Vol. 27 #3, Dec. 1999 – Angel hair (Extrusion Hint)
 - Vol. 27 #3, Dec. 1999 – Portable wet/dry vacuum cleaner
 - Vol. 27 #3, Dec. 1999 – Heat exchanger
 - Vol. 27 #3, Dec. 1999 – Aligning a blown film tower
 - Vol. 27 #3, Dec. 1999 – Polymer degradation
 - Vol. 27 #3, Dec. 1999 – Lap stone
 
- Vol. 27 #2, Nov. 1999 – Coextrusion
 - Vol. 27 #2, Nov. 1999 – Removing polymer melt
 - Vol. 27 #2, Nov. 1999 – Dehumidifying dryers
 - Vol. 27 #2, Nov. 1999 – Interactions
 - Vol. 27 #2, Nov. 1999 – Purge – close vent
 - Vol. 27 #2, Nov. 1999 – Drying temperature
 - Vol. 27 #2, Nov. 1999 – Document/Document/Document
 - Vol. 27 #2, Nov. 1999 – Melt pressure indicator
 - Vol. 27 #2, Nov. 1999 – Twin screw extruder
 - Vol. 27 #2, Nov. 1999 – Improve melt quality
 - Vol. 27 #2, Nov. 1999 – Extruder screw won’t push out
 
- Vol. 27 #1, Mar. 1999 – Deviation alarms
 - Vol. 27 #1, Mar. 1999 – Cross contamination (Hint)
 - Vol. 27 #1, Mar. 1999 – Pre-drying moisture sensitive polymer
 - Vol. 27 #1, Mar. 1999 – Condensation
 - Vol. 27 #1, Mar. 1999 – Extruding amorphous materials
 - Vol. 27 #1, Mar. 1999 – Checking extrusion output rates without the use of a calculator
 - Vol. 27 #1, Mar. 1999 – Profile die design
 - Vol. 27 #1, Mar. 1999 – Corona treatment
 - Vol. 27 #1, Mar. 1999 – Extruder output
 
- Vol. 26 #2, Sep. 1999 – TC moisture
 - Vol. 26 #2, Sep. 1999 – Color marker
 - Vol. 26 #2, Sep. 1999 – Pull the screw
 - Vol. 26 #2, Sep. 1999 – Unmixed polymer gels
 - Vol. 26 #2, Sep. 1999 – Cool dryer return air
 - Vol. 26 #2, Sep. 1999 – Oatmeal
 - Vol. 26 #2, Sep. 1999 – Flow instability
 - Vol. 26 #2, Sep. 1999 – Consistent air
 - Vol. 26 #2, Sep. 1999 – Verify drawings
 
- Vol. 26 #1, Mar. 1999 – Twin screw extrusion (3/99)
 - Vol. 26 #1, Mar. 1999 – Extrusion pump life
 - Vol. 26 #1, Mar. 1999 – Maximum channel depth for high rate
 - Vol. 26 #1, Mar. 1999 – Breaker plate maintenance
 - Vol. 26 #1, Mar. 1999 – Film mount
 - Vol. 26 #1, Mar. 1999 – Extrusion flow stability
 - Vol. 26 #1, Mar. 1999 – Breaker plates
 - Vol. 26 #1, Mar. 1999 – Close loop dryer
 
- Vol. 25 #3, Dec. 1998 – Metering pump
 - Vol. 25 #3, Dec. 1998 – Sizing extruder drives
 - Vol. 25 #3, Dec. 1998 – Die drool
 - Vol. 25 #3, Dec. 1998 – Twin screw extrusion 2
 - Vol. 25 #3, Dec. 1998 – Installing a dehumidifying drying system
 - Vol. 25 #3, Dec. 1998 – Dryer inlet air
 - Vol. 25 #3, Dec. 1998 – Rules of thumb
 - Vol. 25 #3, Dec. 1998 – Pressure transducers 2
 - Vol. 25 #3, Dec. 1998 – Travel tip
 
- Vol. 25 #2, Sep. 1998 – Thermocouples
 - Vol. 25 #2, Sep. 1998 – Vector drives
 - Vol. 25 #2, Sep. 1998 – Safety 2
 - Vol. 25 #2, Sep. 1998 – Sweep up
 - Vol. 25 #2, Sep. 1998 – Chromium plating test solution
 - Vol. 25 #2, Sep. 1998 – Seated TCs
 - Vol. 25 #2, Sep. 1998 – Mini microscope
 - Vol. 25 #2, Sep. 1998 – Turn the screw by hand
 - Vol. 25 #2, Sep. 1998 – Twin screw extrusion
 - Vol. 25 #2, Sep. 1998 – Monitor heaters
 - Vol. 25 #2, Sep. 1998 – Product variations
 - Vol. 25 #2, Sep. 1998 – Purge 2
 
- Vol. 25 #1, May 1998 – Thrust bearing
 - Vol. 25 #1, May 1998 – Pressure taps
 - Vol. 25 #1, May 1998 – Rheology
 - Vol. 25 #1, May 1998 – Chemical purge compound
 - Vol. 25 #1, May 1998 – Heater burnout
 - Vol. 25 #1, May 1998 – Restrictive adapter
 - Vol. 25 #1, May 1998 – Hand held pyrometer
 - Vol. 25 #1, May 1998 – Remove buildup
 - Vol. 25 #1, May 1998 – Stainless steel components
 
- Vol. 24 #3, Dec. 1997 – Avoid feed stock fluidization
 - Vol. 24 #3, Dec. 1997 – Heater amps
 - Vol. 24 #3, Dec. 1997 – Resin supplier
 - Vol. 24 #3, Dec. 1997 – Melt delivery
 - Vol. 24 #3, Dec. 1997 – Purge
 - Vol. 24 #3, Dec. 1997 – Bolt cleaning
 - Vol. 24 #3, Dec. 1997 – Color changes
 - Vol. 24 #3, Dec. 1997 – Insulate vent
 - Vol. 24 #3, Dec. 1997 – Mold release
 - Vol. 24 #3, Dec. 1997 – Feed stock supply
 - Vol. 24 #3, Dec. 1997 – Monitor back pressure
 - Vol. 24 #3, Dec. 1997 – Max RPM
 
- Vol. 24 #2, Sep. 1997 – Poor stranding
 - Vol. 24 #2, Sep. 1997 – Pressure wash extrusion lines
 - Vol. 24 #2, Sep. 1997 – Melt thermocouples
 - Vol. 24 #2, Sep. 1997 – Purge compound
 - Vol. 24 #2, Sep. 1997 – Die and screw cleaning
 - Vol. 24 #2, Sep. 1997 – Semi-works operations
 - Vol. 24 #2, Sep. 1997 – Suction pressure
 - Vol. 24 #2, Sep. 1997 – Transitioning
 - Vol. 24 #2, Sep. 1997 – Protect the pump
 - Vol. 24 #2, Sep. 1997 – Gear pumps
 - Vol. 24 #2, Sep. 1997 – Protect the barrel
 
- Vol. 24 #1, Mar. 1997 – Pump acceleration rate
 - Vol. 24 #1, Mar. 1997 – Startup timers
 - Vol. 24 #1, Mar. 1997 – Vent flow
 - Vol. 24 #1, Mar. 1997 – DC drive failure
 - Vol. 24 #1, Mar. 1997 – Extra breaker plates
 - Vol. 24 #1, Mar. 1997 – Incoming power
 - Vol. 24 #1, Mar. 1997 – Loose heaters
 - Vol. 24 #1, Mar. 1997 – After rebuild
 - Vol. 24 #1, Mar. 1997 – Dissimilar metals
 - Vol. 24 #1, Mar. 1997 – Gels 3
 - Vol. 24 #1, Mar. 1997 – Screw removal 4
 - Vol. 24 #1, Mar. 1997 – PET dryer instrumentation
 
- Vol. 23 #3, Dec. 1996 – Extruder mounts
 - Vol. 23 #3, Dec. 1996 – Vacuum pump discharge
 - Vol. 23 #3, Dec. 1996 – Tools
 - Vol. 23 #3, Dec. 1996 – Decreased motor amps
 - Vol. 23 #3, Dec. 1996 – New extrusion setup
 - Vol. 23 #3, Dec. 1996 – Gear pump lubrication
 - Vol. 23 #3, Dec. 1996 – Safety
 - Vol. 23 #3, Dec. 1996 – Vents 2
 - Vol. 23 #3, Dec. 1996 – Cooling water flow
 - Vol. 23 #3, Dec. 1996 – Fouling
 - Vol. 23 #3, Dec. 1996 – Twin screw
 - Vol. 23 #3, Dec. 1996 – New screw shank lubricant
 
- Vol. 23 #2, Oct. 1996 – Colored mixing drums
 - Vol. 23 #2, Oct. 1996 – Screw cleaning 2
 - Vol. 23 #2, Oct. 1996 – Twin screw installation
 - Vol. 23 #2, Oct. 1996 – Power factor
 - Vol. 23 #2, Oct. 1996 – Zirconia blades
 - Vol. 23 #2, Oct. 1996 – Die cleaning
 - Vol. 23 #2, Oct. 1996 – Twin screw help
 - Vol. 23 #2, Oct. 1996 – Removing gels
 - Vol. 23 #2, Oct. 1996 – Training
 - Vol. 23 #2, Oct. 1996 – Unmelt gels
 - Vol. 23 #2, Oct. 1996 – Eye protection
 
- Vol. 23 #1, May 1996 – Pressure blips
 - Vol. 23 #1, May 1996 – Static electricity build up
 - Vol. 23 #1, May 1996 – Reduce static in polymer processing operations
 - Vol. 23 #1, May 1996 – Screw removal 3
 - Vol. 23 #1, May 1996 – Gels 2
 - Vol. 23 #1, May 1996 – Melt blocking
 - Vol. 23 #1, May 1996 – Purge material
 - Vol. 23 #1, May 1996 – Stripping vent help
 - Vol. 23 #1, May 1996 – Improved dies
 - Vol. 23 #1, May 1996 – Feed rate limited
 - Vol. 23 #1, May 1996 – For safety sake 2
 
- Vol. 22 #3, Dec. 1995 – Gearbox oil level
 - Vol. 22 #3, Dec. 1995 – Transducer accuracy
 - Vol. 22 #3, Dec. 1995 – Transducer removal
 - Vol. 22 #3, Dec. 1995 – Reinstalling a screw
 - Vol. 22 #3, Dec. 1995 – Brass bolts on flange collar
 - Vol. 22 #3, Dec. 1995 – Leaks
 - Vol. 22 #3, Dec. 1995 – Gear pump assembly
 - Vol. 22 #3, Dec. 1995 – Output calculations
 - Vol. 22 #3, Dec. 1995 – Start up efficiency
 - Vol. 22 #3, Dec. 1995 – Motor overheating
 
- Vol. 22 #2, Sep. 1995 – Transducer calibration
 - Vol. 22 #2, Sep. 1995 – Bridge breaker
 - Vol. 22 #2, Sep. 1995 – Screw removal 2
 - Vol. 22 #2, Sep. 1995 – Heat transfer
 - Vol. 22 #2, Sep. 1995 – Adapter flow
 - Vol. 22 #2, Sep. 1995 – Screw installation 2
 - Vol. 22 #2, Sep. 1995 – Data collection 1
 - Vol. 22 #2, Sep. 1995 – Twin scale up
 - Vol. 22 #2, Sep. 1995 – Inconsistent gear pump output
 - Vol. 22 #2, Sep. 1995 – Vent design
 
- Vol. 22 #1, Jun. 1995 – Screen utilization
 - Vol. 22 #1, Jun. 1995 – Lab extruders
 - Vol. 22 #1, Jun. 1995 – Clean out dust and flake
 - Vol. 22 #1, Jun. 1995 – Vent plugging
 - Vol. 22 #1, Jun. 1995 – Predictive maintenance
 - Vol. 22 #1, Jun. 1995 – Pressure increases temperature
 - Vol. 22 #1, Jun. 1995 – Liquid injection
 - Vol. 22 #1, Jun. 1995 – 2 machines 1 material
 - Vol. 22 #1, Jun. 1995 – Corona treater power
 - Vol. 22 #1, Jun. 1995 – Water valve off
 
- Vol. 21 #3, Dec. 1994 – Preventative maintenance list
 - Vol. 21 #3, Dec. 1994 – Drive speed controller
 - Vol. 21 #3, Dec. 1994 – Spin dryer
 - Vol. 21 #3, Dec. 1994 – Vent port fouling
 - Vol. 21 #3, Dec. 1994 – Changing resin types
 - Vol. 21 #3, Dec. 1994 – Assembling a screen pack
 - Vol. 21 #3, Dec. 1994 – Adapter flange leak
 - Vol. 21 #3, Dec. 1994 – Start up 2
 - Vol. 21 #3, Dec. 1994 – For safety’s sake 1
 
- Vol. 21 #2, Oct. 1994 – Storage
 - Vol. 21 #2, Oct. 1994 – Barrel thermocouple maintenance
 - Vol. 21 #2, Oct. 1994 – Storage of extruders
 - Vol. 21 #2, Oct. 1994 – Hopper magnets
 - Vol. 21 #2, Oct. 1994 – Gels 1
 - Vol. 21 #2, Oct. 1994 – Flex tube safety
 - Vol. 21 #2, Oct. 1994 – Plant layout
 - Vol. 21 #2, Oct. 1994 – Level switch problems
 - Vol. 21 #2, Oct. 1994 – Reversed temperature profile 2
 - Vol. 21 #2, Oct. 1994 – Hot gearbox 2
 - Vol. 21 #2, Oct. 1994 – Liquid in feed
 - Vol. 21 #2, Oct. 1994 – Lubricate screw shank
 - Vol. 21 #2, Oct. 1994 – Protect your hand
 - Vol. 21 #2, Oct. 1994 – Hose clamp safety
 
- Vol. 21 #1, Jun. 1994 – Water piping
 - Vol. 21 #1, Jun. 1994 – Broken couplings
 - Vol. 21 #1, Jun. 1994 – Reversed temperature profile 1
 - Vol. 21 #1, Jun. 1994 – Warning: casting rolls
 - Vol. 21 #1, Jun. 1994 – Hot gearbox 1
 - Vol. 21 #1, Jun. 1994 – Control systems
 - Vol. 21 #1, Jun. 1994 – Product/color changeover
 - Vol. 21 #1, Jun. 1994 – Screen changing with a continuous screen changer
 - Vol. 21 #1, Jun. 1994 – Feeding low bulk density
 - Vol. 21 #1, Jun. 1994 – Adjustable melt TC
 - Vol. 21 #1, Jun. 1994 – Coextrusion: melt strength
 
- Vol. 20 #3, Dec. 1993 – Material clean out
 - Vol. 20 #3, Dec. 1993 – Screw installation 1
 - Vol. 20 #3, Dec. 1993 – Die lip buildup
 - Vol. 20 #3, Dec. 1993 – Cooling water
 - Vol. 20 #3, Dec. 1993 – Hopper segregation
 - Vol. 20 #3, Dec. 1993 – Segmented screws
 - Vol. 20 #3, Dec. 1993 – Simulations
 - Vol. 20 #3, Dec. 1993 – Lower feed zone temperature
 - Vol. 20 #3, Dec. 1993 – Coextrusion control
 - Vol. 20 #3, Dec. 1993 – Cold gearbox oil
 - Vol. 20 #3, Dec. 1993 – Overfilled gearbox
 - Vol. 20 #3, Dec. 1993 – Early detection
 - Vol. 20 #3, Dec. 1993 – Vent openings
 - Vol. 20 #3, Dec. 1993 – Zone cooling check up
 - Vol. 20 #3, Dec. 1993 – Temperature measurement 2
 - Vol. 20 #3, Dec. 1993 – Turnaround delays
 
- Vol. 20 #2, Jul. 1993 – Screw position
 - Vol. 20 #2, Jul. 1993 – Drive motor start up
 - Vol. 20 #2, Jul. 1993 – Easy screw disassembly
 - Vol. 20 #2, Jul. 1993 – Purging
 - Vol. 20 #2, Jul. 1993 – Worn screw
 - Vol. 20 #2, Jul. 1993 – Extruder log book
 - Vol. 20 #2, Jul. 1993 – Water cooling
 - Vol. 20 #2, Jul. 1993 – Surging
 - Vol. 20 #2, Jul. 1993 – Gear pump wear
 - Vol. 20 #2, Jul. 1993 – How to stop a vacuum pump
 - Vol. 20 #2, Jul. 1993 – Temperature measurement 1
 - Vol. 20 #2, Jul. 1993 – Shaft leakage
 
- Vol. 20 #1, Mar. 1993 – Feed throat configuration
 - Vol. 20 #1, Mar. 1993 – Gearpump changes
 - Vol. 20 #1, Mar. 1993 – Extruder cooling
 - Vol. 20 #1, Mar. 1993 – PLC circuits
 - Vol. 20 #1, Mar. 1993 – Feed section
 - Vol. 20 #1, Mar. 1993 – Plot extruder performance
 - Vol. 20 #1, Mar. 1993 – Extruder drive
 - Vol. 20 #1, Mar. 1993 – Head pressure
 - Vol. 20 #1, Mar. 1993 – The art of details
 - Vol. 20 #1, Mar. 1993 – Temperature control
 - Vol. 20 #1, Mar. 1993 – Screen packs 2
 - Vol. 20 #1, Mar. 1993 – Die heaters
 - Vol. 20 #1, Mar. 1993 – Screw flight cracks
 - Vol. 20 #1, Mar. 1993 – Vent location
 
- Vol. 19 #3, Nov. 1992 – Sheet die start up
 - Vol. 19 #3, Nov. 1992 – Extrusion trials
 - Vol. 19 #3, Nov. 1992 – Vent bleed
 - Vol. 19 #3, Nov. 1992 – Record root diameter
 - Vol. 19 #3, Nov. 1992 – Thermocouple wires
 - Vol. 19 #3, Nov. 1992 – Melt block problems
 - Vol. 19 #3, Nov. 1992 – PET Dryer
 - Vol. 19 #3, Nov. 1992 – Color feeder calibration
 - Vol. 19 #3, Nov. 1992 – Feed throats
 - Vol. 19 #3, Nov. 1992 – Worn barrel
 
- Vol. 19 #2, Jun. 1992 – Screw cleaning 1
 - Vol. 19 #2, Jun. 1992 – Roll edge quality
 - Vol. 19 #2, Jun. 1992 – Gel identification
 - Vol. 19 #2, Jun. 1992 – Screw drawings
 - Vol. 19 #2, Jun. 1992 – Low viscosity addition
 - Vol. 19 #2, Jun. 1992 – Temperature controller calibration
 - Vol. 19 #2, Jun. 1992 – Time dimension
 - Vol. 19 #2, Jun. 1992 – High low melt blends
 - Vol. 19 #2, Jun. 1992 – Feed throat temperature
 - Vol. 19 #2, Jun. 1992 – Purging gels
 - Vol. 19 #2, Jun. 1992 – Sheet pinning
 - Vol. 19 #2, Jun. 1992 – Seed counter
 
- Vol. 19 #1, Feb. 1992 – Brush wear forecasting
 - Vol. 19 #1, Feb. 1992 – Threaded commutators
 - Vol. 19 #1, Feb. 1992 – Pressure transducer handling
 - Vol. 19 #1, Feb. 1992 – Thermocouple connections 2
 - Vol. 19 #1, Feb. 1992 – Casting roll bearing
 - Vol. 19 #1, Feb. 1992 – Extrusion data sheets
 - Vol. 19 #1, Feb. 1992 – Computer simulation
 - Vol. 19 #1, Feb. 1992 – High motor amps
 - Vol. 19 #1, Feb. 1992 – Gauge systems
 - Vol. 19 #1, Feb. 1992 – Razor knives
 - Vol. 19 #1, Feb. 1992 – Troubleshooting with barrel zones
 
- Vol. 18 #2, Jul. 1991 – Not dry enough
 - Vol. 18 #2, Jul. 1991 – Barrel heaters
 - Vol. 18 #2, Jul. 1991 – Patience
 - Vol. 18 #2, Jul. 1991 – Throughput check
 - Vol. 18 #2, Jul. 1991 – Gauge variation
 - Vol. 18 #2, Jul. 1991 – Static eliminator
 - Vol. 18 #2, Jul. 1991 – No service call
 - Vol. 18 #2, Jul. 1991 – Twin screw changes
 - Vol. 18 #2, Jul. 1991 – Underwater pelletizer
 - Vol. 18 #2, Jul. 1991 – Bevel outside
 - Vol. 18 #2, Jul. 1991 – Throat cooling
 
- Vol. 17 #4, Mar. 1991 – Feed throat cooling
 - Vol. 17 #4, Mar. 1991 – Oak persuaders
 - Vol. 17 #4, Mar. 1991 – Coextrusion alarms
 - Vol. 17 #4, Mar. 1991 – Screw specifications
 - Vol. 17 #4, Mar. 1991 – Strand cooling: good housekeeping
 - Vol. 17 #4, Mar. 1991 – Vents 1
 - Vol. 17 #4, Mar. 1991 – Drive train
 - Vol. 17 #4, Mar. 1991 – Screw removal 1
 - Vol. 17 #4, Mar. 1991 – Brass tools 2
 - Vol. 17 #4, Mar. 1991 – Output rates
 - Vol. 17 #4, Mar. 1991 – Barrel zone override
 
- Vol. 17 #3, Dec. 1990 – Output variation 2
 - Vol. 17 #3, Dec. 1990 – Extruder throat cooling
 - Vol. 17 #3, Dec. 1990 – Vent insert design
 - Vol. 17 #3, Dec. 1990 – Screw inspection
 - Vol. 17 #3, Dec. 1990 – Heater contact
 - Vol. 17 #3, Dec. 1990 – Throughput rate checks
 - Vol. 17 #3, Dec. 1990 – Screw design
 - Vol. 17 #3, Dec. 1990 – Calibrate tachs
 - Vol. 17 #3, Dec. 1990 – Mark the bubble
 - Vol. 17 #3, Dec. 1990 – Silicone grease
 - Vol. 17 #3, Dec. 1990 – Melt pressure
 - Vol. 17 #3, Dec. 1990 – Screw performance
 - Vol. 17 #3, Dec. 1990 – Calibrate transducers
 
- Vol. 17 #2, Jul. 1990 – Screw wear
 - Vol. 17 #2, Jul. 1990 – Melt temperature
 - Vol. 17 #2, Jul. 1990 – Gear box oil
 - Vol. 17 #2, Jul. 1990 – Tidal waves
 - Vol. 17 #2, Jul. 1990 – Check new screws
 - Vol. 17 #2, Jul. 1990 – Pressure transducers
 - Vol. 17 #2, Jul. 1990 – Nylon purge
 - Vol. 17 #2, Jul. 1990 – Output variation 1
 - Vol. 17 #2, Jul. 1990 – Twin screw color change
 - Vol. 17 #2, Jul. 1990 – Accurate melt temperature
 
- Vol. 17 #1, Feb. 1990 – Brass tools 1
 - Vol. 17 #1, Feb. 1990 – Electric screwdrivers
 - Vol. 17 #1, Feb. 1990 – Start up 1
 - Vol. 17 #1, Feb. 1990 – Hoppers
 - Vol. 17 #1, Feb. 1990 – Anti seize compounds
 - Vol. 17 #1, Feb. 1990 – LLDPE lensing
 - Vol. 17 #1, Feb. 1990 – Start new screw
 - Vol. 17 #1, Feb. 1990 – Screw cooling
 